Problem :

A business manager of a cemetery factory has expressed his intention to purchase a desalination unit to produce water desalting facilities  . he requests to his staff to prepare the tender specification of this unit . the factory is localized in inland , a source of brackish water is available with a salinity of 10 g/L . the feed volume flow rate will be 1.5 m3/day . the concentration of the permeate does not exceed a 0.5 g/L . zero liquid discharge presents his ultimatum condition . in agreement with these requirement , you are requested to suggest two options with drawing , performance and economic comparison .

 

  OPTION (1) : 1ST STAGERO BATCH MODE (RR=80% ) +2d STAGE SOLAR POND (20 % ) , SIZING. DESIGN

OPTION (2 ) : 1ST STAGE ED (RR=90% ) +2d STAGE SOLAR POND (10% )   ,SIZING DESIGN.

 

ENERGY ?

AREA ?

REJECT VOLUME FLOW RATE ?

FINAL CONCENTRATION?

COST ?

Needs help with similar assignment?

We are available 24x7 to deliver the best services and assignment ready within 3-12hours? Order a custom-written, plagiarism-free paper

Get Answer Over WhatsApp Order Paper Now

Do you have an upcoming essay or assignment due?

All of our assignments are originally produced, unique, and free of plagiarism.

If yes Order Paper Now